Have you checked what the site will allow?

Boundaries, drains, trees, access and services decide what is buildable before taste does.

When it lands
Early — ideally before you pay for a design.
What it costs to get wrong
A drain run or a protected tree discovered after planning can force a redesign costing thousands and months.

Before taste gets a say, the plot decides what is buildable. Boundaries, drains, trees, services and access set the outer limits, and every one of them is discoverable before you pay for a design.

The cheapest survey is always cheaper than the redesign it prevents.

Order the documents first

The title register and title plan tell you where your ownership ends and whether anything is registered against the property — rights of way, covenants restricting extensions, shared access. They cost a few pounds and take minutes to obtain.

A drainage asset plan from the water authority shows public sewers and shared laterals. If a sewer crosses your footprint, you are into a build-over agreement, and possibly a diversion.

Look under the plot, not just at it

Trees with preservation orders, ground conditions, an old shared drain running diagonally across the garden, an electricity or gas service crossing where the foundations want to be — none of these are visible on a sunny site visit.

Foundations were dug on a Kent extension before anyone requested an asset plan. A shared lateral drain ran diagonally under the new footprint. Redesigned foundations, a build-over agreement obtained retrospectively, and three weeks lost — all for a document that could have been requested at the very beginning.

Access is a cost, not a detail

How does a nine-tonne load of materials reach the back of the house? Is there anywhere to put a skip, a welfare unit, a spoil heap? Restricted access can add meaningfully to labour because everything is barrowed rather than delivered.

Builders price what they can see. If access is difficult, say so in the tender pack — otherwise you will hear about it as a variation.

Walk the boundaries with the plan in your hand

Physically pace the plot against the title plan. Fences move over decades, and the line you have always assumed is yours may sit half a metre off. Discovering that at excavation stage turns a survey question into a neighbour dispute.

Why this one matters

These are facts, not opinions, and they are cheap to establish now. Discovering them later turns them into variations, and variations are priced when you have no alternative.

Do this week

  • Order the title register and plan.
  • Request the drainage asset plan from your water authority.
  • Walk the boundary with the plan and photograph anything that does not match.

The realistic choices

  • Quick homeowner check

    Deeds, drain covers, tree preservation search. Free, an afternoon's work.

  • Measured survey

    A few hundred pounds. Makes every drawing and quote more accurate.

  • Full site investigation

    For sloping, unusual or previously built-on ground.

What good looks like

  • You know where the drains run and who owns the boundary
  • You know whether any tree on or near the site is protected

Questions worth asking

  • What could stop this being built as drawn?
  • Whose land does the boundary sit on?

From real projects

The sewer nobody looked for

Foundations were dug on a Kent extension before anyone requested an asset plan. A shared lateral drain ran diagonally under the new footprint. Redesigned foundations and a retrospective build-over agreement cost £11,000 and five weeks.

The lesson: A £7 title check and a free asset plan are the cheapest hours in the entire project.

Putting it into practice

What this decision should leave behind

The steps to work through, the paperwork worth keeping and the questions to send your builder today.

  • · Order the title documents
  • · Check what is on and under the plot
  • · Walk the boundaries with the plan
  • · Template: Water authority build-over enquiry
  • · Paperwork: Title register and plan
  • · Paperwork: Drainage asset plan from the water authority
  • · Paperwork: Measured survey of the existing house